ExPRESS Logistics Carrier – 3

ELC-3 was part of the payload from STS-134 mission, last flight of Endeavour, launched on May 18, 2011. The other payload aboard was the AMS-02.

STS-134

image

Original configuration (top or inboard)
FRAM 1 Cargo Transport Container-5 (CTC-5)
FRAM 2 DEXTRE (SPDM) Arm
FRAM 3 empty
FRAM 4 S Band Antenna Subsystem Assembly #3 (SASA)

Original configuration (keel or outboard)
FRAM 5 Space Test Program Houston 3 (STP-H3)
FRAM 6 Ammonia Tank Assembly (ATA)
FRAM 7 High Pressure Gas Tank (HPGT)
FRAM 8 S Band Antenna Subsystem Assembly #2 (SASA)

Download file here

ELC-3 is located on the P3 truss at the UCCAS-1 attachment site.

image

image

HTV-3

The SCaN Testbed payload arrived in July 2012 via HTV-3 and was installed on FRAM-3 via DEXTRE.

image

FRAM 1 Cargo Transport Container-5 (CTC-5)
FRAM 2 DEXTRE (SPDM) Arm
FRAM 3 SCaN Testbed
FRAM 4 S Band Antenna Subsystem Assembly #3 (SASA)

Download file here

During HTV-4 mission, the STP-H3 payload was removed by DEXTRE and placed on HTV-4 pallet for disposal.

FRAM 5 Empty
FRAM 6 Ammonia Tank Assembly (ATA)
FRAM 7 High Pressure Gas Tank (HPGT)
FRAM 8 S Band Antenna Subsystem Assembly #2 (SASA)

image

Download file here

No changes as of this post (Feb 2016)

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s