ExPRESS Logistic Carrier – 1

The ELC-1 was part of the payload from STS-129 launched on Nov 16, 2009.

STS-129


Original Configuration (top or outboard)

FRAM 1 Latching End Effector (LEE)
FRAM 2 Plasma Contactor Unit (PCU)
FRAM 3 empty
FRAM 4 Battery Charger Discharge Unit (BCDU)
FRAM 5 Control Moment Gyroscope (CMG104)


Original Configuration (keel or inboard)

FRAM 6 Nitrogen Tank Assembly (NTA0002)
FRAM 7 Pump Module (PM0007)
FRAM 8 empty
FRAM 9 Ammonia Tank Assembly (ATA)

It was installed on the nadir side (bottom) of the P3 truss at the UCCAS-2 attachment site.

image

Download file here

HTV-4

The STP-H4 was delivered by the HTV-4 Exposed pallet, and was placed at FRAM 3 by DEXTRE (SPDM) on August 2013.

image

Outboard configuration
FRAM 1 Latching End Effector (LEE)
FRAM 2 Plasma Contactor Unit (PCU)
FRAM 3 STP-H4
FRAM 4 Battery Charger Discharge Unit (BCDU)
FRAM 5 Control Moment Gyroscope (CMG104)

Download file here

CRS-3

SpaceX Dragon on mission CRS-3 delivered the OPALS Payload which was placed on FRAM 8 via DEXTRE (SPDM) on May 7, 2014.

image

Inboard configuration
FRAM 6 Nitrogen Tank Assembly (NTA0002)
FRAM 7 Pump Module (PM0007)
FRAM 8 OPALS
FRAM 9 Ammonia Tank Assembly (ATA)

Download file here

On Aug 31, 2015, DEXTRE removed the STP-H4 payload from ELC-1 and transferred it to the HTV-5 External pallet. On Sep 28, 2015, the HTV-5 cargo craft departed the ISS carrying trash and payloads including the STP-H4 for a destructive re-entry over the South Pacific.

image

Outboard configuration
FRAM 1 Latching End Effector (LEE)
FRAM 2 Plasma Contactor Unit (PCU)
FRAM 3 empty
FRAM 4 Battery Charger Discharge Unit (BCDU)
FRAM 5 Control Moment Gyroscope (CMG104)

CRS-10

img_2496

The OPALS payload was removed from ELC-1 by DEXTRE on Feb 27, 2017.
Dragon CRS-10 delivered the STP-H5 payload which was placed on ELC-1 Site 8 on Feb 28, 2017.

Inboard configuration (as of this post Mar 2017)
FRAM 6 Nitrogen Tank Assembly (NTA0002)
FRAM 7 Pump Module (PM0007)
FRAM 8 STP-H5
FRAM 9 Ammonia Tank Assembly (ATA)

Outboard configuration (as of this post Mar 2017)
FRAM 1 Latching End Effector (LEE)
FRAM 2 Plasma Contactor Unit (PCU)
FRAM 3 empty
FRAM 4 Battery Charger Discharge Unit (BCDU)
FRAM 5 Control Moment Gyroscope (CMG104)

Download file here.

Advertisements

One response to “ExPRESS Logistic Carrier – 1

  1. Pingback: CRS-10 Robotics – STP-H5 installation | AXM Paper Space Scale Models Blog·

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s