LIVE! CRS-3 payloads installation – Part 3

This was a LIVE blog on 5/5/14 about DEXTRE robotics operation to continue with the installation of the OPALS payload. The DEXTRE and ISS papermodels were used to demonstrate this event. See the ISS LIVE stream here.

Due to a misalignment between DEXTRE and OPALS, a new software has been uploaded and DEXTRE has been instructed to reenter the trunk to re-attempt the removal of the OPALS payload.

image

DEXTRE is entering the trunk.

image

Getting closer to OPALS grapple fixture.

image

image

OPALS is being removed now from payload support plate #3.

image

image

image

OPALS has been pulled out of the trunk!

image

Next step is to place OPALS onto the DEXTRE’s EOTP.
The LIVE video has stopped from streaming. Hopefully it will resume soon.

Here my model demonstrates how the OPALS is fitted onto DEXTRE’s EOTP.

image

image

Photo shows the OPALS payload on the EOTP

image

Next step:

The Station’s robotic arm (Canadarm 2) will place DEXTRE on a grapple fixture on the exterior of the US Destiny Lab, so it can relocate itself to a new anchor point on the Mobile Base System.

image

Leave a comment